Jawahar Navodaya Vidyalaya lakhimpur U.P.
Date : 14-11-2018 Time : 08:56:55 AM
Construction Activities: -
 
 

I

Area of land  allotted (in acres)

 

Whether land transferred in the Name of Samiti

 

Vidyalaya shifted to permanent buildings on

 

 

: 52.3 Acres

 

:

 

 

:

 

ii

Status of Boundary Wall

 

a.  Brick Wall

b.  Barbed wire fencing

 

 

: Completed 

 

iii

Permanent buildings constructed

 

 

:  CPWD pattern

 

iv

School building

 

 

 

: Complete

 

v

Dormitories

:  Boys   06     Nos.

   with Warden Residence 10____ Nos.

 

 

 

 

:  Girls   04  Nos.

   with Warden Residence 04  Nos.

 

 

vi

Kitchen/dining Hall

 

No. of shifts required for all students  to take food

 

 

:  Complete

 

vii

Principal Residence

 

 

:  01  No.

 

viii

Staff Quarters

 

 

 

 

: Type III =  12  Nos.

  Type II =   06  Nos.

  Type   I =  06  Nos.

  SP Sheds converted into Staff Qrs.:_____ Nos.

 

ix

M.P. Hall

 

:  not available

x

Workshop

 

:  not available

xi

Type of O.H. Tank

 

Its capacity

 

Present Status

 

:  Column based

 

:  ___100000____ litres

 

: Working satisfactory / not satisfactory

xii

U.G. tank

 

Its capacity

 

Present Status

 

 

:  _100000______ litres

 

: Working satisfactory

xiii

D.G. Set

 

 

 

 

:  Available

: __15_KVA_& 25 KVA not working

: Year of procurement

 

xiv

Sewage Pump

 

: _05_______ H.P.

xv

Water Pump

 

 

: ________ capacity

xvi

Electrification

 

Electric connection

Sub Station building

Street lighting

 

Numbers of hrs. during day when power supply is available on an average.

 

 

 

 :  Rural

: __22________ Nos. of Poles

 

 

: __10______ hrs.

  

xvii

Playfields

 

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

 

 

: Available

:  _____2__Nos.   – Available

:  ____2___Nos.   – Available

 

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

 

 

 

: Potable,  ______ N/A

: Potable, _07_ Nos.-  working

:  ______ hours supply in a day

xix

Rajiv Gandhi Smriti Van

 

:  Available

xx

Fire fighting arrangement

 

:  Working

xxi

Last date of cleaning of

  1. Septic tank
  2. Water tanks

 

:2011

:2012

xxii

Whether area around transformer is fenced

:  Yes 

xxiii

Whether open wells, if any, are covered from top

:   No

xxiv

Works taken up under M&R fund during current year and last year:-

 

:

Year

Name of work  (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

2012

White washing & electric wire

3.5 lakh

3.5 lakh

 

                        Details of vehicle provided to the Vidyalaya

 

(i)

Whether vehicle is provided or not (Yes/No)

 

YES

(ii)

Description to vehicle.

 

BOLERO  6 SEATER

(iii)

Model no and date of purchase.

 

 

(iv)

Present condition of the Vehicle.

 

 

GOOD

 

Untitled Document